Bacon Tech Spec
Set
All provided by the company.
Floor cloth 3m x 2m or 3m x 2m
Stool
Tea Trolley
3 x 2m x 1m flats
Lighting
If possible we require the lights to be pre-rigged and coloured.
Please see the generic lighting plan and cue sheet by clicking Here
to download as a 54k Word Document ; this Word document also contains all the
info on this web page.
9 x 1k profiles all with working shutters
2 x 1k fresnels with barndoors
1 x practical pendant (toured with the company)
Colour
1 x lee 201 for fresnel
1 x lee 156 (chocolate) for fresnel
3 x lee 101 (yellow) for profiles
3 x lee 132 (medium blue) for profiles
3 x lee 106 (primary red) for profiles
The positions of the profiles are very specific.
There are 3 groups of 3 profiles all from Front of House.
Each group needs to be able to light one of three 2m x 1m wide flats.
FOH left group needs to light SL flat
FOH middle group needs to light middle flat
FOH right group needs to light SR flat
This means the beams cross on a stool CS.
(Please see the downloadable plan for a clearer idea of what I mean!)
The beams need to be shuttered onto each flat as sharp as possible to the edges
but without spilling over.
The fresnels need to be barndoored to the floor cloth.
There are 20 LX cues all marked up in the script which will be provided on the
day.
Sound
1 minidisc player and PA suitable for the space to be in place and ready for
playback prior to our arrival.
There are 7 sound cues all marked up in the script which will be provided on the
day.
Get-In
4 hours if not pre-rigged
|